|
SEKOLAH TINGGI TEKNOLOGI | ||||||||||
| DUTA BANGSA | |||||||||||
| JOB SHEET METALURGI FISIK | |||||||||||
| SEMESTER 4 | CLAMP | ||||||||||
| Date: 7 August 2016 | No. 2.2 | ||||||||||
| Tools and materials : | |||||||||||
| 1. Steel wire in diameter 10 and 12 | 5. screwdriver | ||||||||||
| 2. plates of steel | 6. bolt | ||||||||||
| 3. A cut and printing machine | 7. welding tools | ||||||||||
| 4. punching machine | 8. oven | ||||||||||
| 5. Instrument drill | |||||||||||
| Safety of working : | |||||||||||
| 1. Use a self protection and wearpack | |||||||||||
| 2. Put instrument work and materials in right place | |||||||||||
| 3. Use tools as the function is fit | |||||||||||
| 4. Work with a careful and thorough | |||||||||||
| 5. Follow guidance and instructors | |||||||||||
| work steps: | |||||||||||
| 1. cut wire | |||||||||||
| 2. cut and print plates of steel | |||||||||||
| 3. Enter the wire diameter 12 on a punching to make head. | |||||||||||
| 4. Wire diameter 12 incorporated into an oven as much as two times | |||||||||||
| - The first to strengthen metal with high temperature | |||||||||||
| - The second process to stabilize metal by low temperature | |||||||||||
| 5. Drill a part of the head | |||||||||||
| 6. Pairs of wire diameter 10 on the head wire diameter 12 | |||||||||||
| 7. joint it with welding | |||||||||||
| 8. Polish material to former in welding | |||||||||||
| 9. Assemble a whole the material into one in accordance with a screwdriver design and bolts | |||||||||||
Minggu, 07 Agustus 2016
CONTOH JOB SHEET CLAMP (ENGLISH)
Langganan:
Posting Komentar (Atom)

Tidak ada komentar:
Posting Komentar