|
SEKOLAH TINGGI TEKNOLOGI | ||||||||||
DUTA BANGSA | |||||||||||
JOB SHEET METALURGI FISIK | |||||||||||
SEMESTER 4 | CLAMP | ||||||||||
Date: 7 August 2016 | No. 2.2 | ||||||||||
Tools and materials : | |||||||||||
1. Steel wire in diameter 10 and 12 | 5. screwdriver | ||||||||||
2. plates of steel | 6. bolt | ||||||||||
3. A cut and printing machine | 7. welding tools | ||||||||||
4. punching machine | 8. oven | ||||||||||
5. Instrument drill | |||||||||||
Safety of working : | |||||||||||
1. Use a self protection and wearpack | |||||||||||
2. Put instrument work and materials in right place | |||||||||||
3. Use tools as the function is fit | |||||||||||
4. Work with a careful and thorough | |||||||||||
5. Follow guidance and instructors | |||||||||||
work steps: | |||||||||||
1. cut wire | |||||||||||
2. cut and print plates of steel | |||||||||||
3. Enter the wire diameter 12 on a punching to make head. | |||||||||||
4. Wire diameter 12 incorporated into an oven as much as two times | |||||||||||
- The first to strengthen metal with high temperature | |||||||||||
- The second process to stabilize metal by low temperature | |||||||||||
5. Drill a part of the head | |||||||||||
6. Pairs of wire diameter 10 on the head wire diameter 12 | |||||||||||
7. joint it with welding | |||||||||||
8. Polish material to former in welding | |||||||||||
9. Assemble a whole the material into one in accordance with a screwdriver design and bolts | |||||||||||
Minggu, 07 Agustus 2016
CONTOH JOB SHEET CLAMP (ENGLISH)
Langganan:
Posting Komentar (Atom)
Tidak ada komentar:
Posting Komentar